SIDEWALK REPLACEMENT SCHEDULE

Please be advised that crews will be working on the following streets to replace damaged sections of sidewalks:

  • Belmont Ave – From Broad St to Franklin St
  • Broad St – From Washington Ave to Park Ave, and Cottage Pl to Allen Park Pl
  • Carpenter St – From Stone St to Cleveland Ave
  • Cottage Pl – From Broadway to Broad St
  • Drake Ave – From South Ave to Broad St
  • E. Grove St – From Elizabeth St to Wilbur St
  • E. Walnut St – From Broad St to Stephen St
  • E. Sands St – From Elizabeth St to Maxwell Field
  • Earl Ave – From Sylvan St to Seneca St
  • Elizabeth St – From Lexington Ave to East Ave
  • Franklin St – From Cleveland Ave to Belmont Ave
  • Leonard St – From S. Willow St to Loucks St
  • Main St – From Stone St to E. Walnut St
  • Seneca St – From Stone St to Cleveland Ave
  • Shattuck Ave – From Broad St to Main St
  • Saint Joseph Pl – From North St to Main St
  • Stone St – From Loucks St to Sayles St
  • Tilden St – From Coe Ave to Summit Ave
  • W. Jenkins St – From Broad St to Main St
  • W. Walnut St – From Seneca St to Broad St
  • Washington Ave – From S. Willow St to West St