Road Milling Schedule

Paving of streets under this year’s program is expected to commence on July 29th. Residents can expect minor inconveniences, but traffic will be allowed and safety will be ensured.

 

The following streets are being paved as part of this year’s program:

 

  • Carpenter Street – from Stone St. to Cleveland Ave.
  • Cedarcrest Lane – from Hunt Valley Rd. to Stoneleigh Rd.
  • Driftwood Drive – from Willow Meadow Way to Cedarcrest Ln.
  • East Ave – from Elizabeth St. to End
  • Freedom Drive – from Glenwood Ave. to End
  • Gale Street – from Phelps St. to Messenger St.
  • James Street – from Madison St. to Phelps St.
  • Lexington Avenue – from Bennett St. to Elizabeth St.
  • Messenger Street – from Gale St. to Cedar St.
  • Phelps Street – from Main St. to Cedar St.
  • Phillips Street – from Grand St. to Boston St.
  • Ryan’s Way – from Hunt Valley Rd. to End
  • Seneca Street – from Summit Ave. to Genesee St. and from Genesee St. to south End
  • Stephens Street – from Lenox Ave. to Bennett St.
  • Stoneleigh Road – from Patio Circle Dr. to Genesee St.
  • Wayland Smith Drive – from Seneca St. to Fields Dr.
  • Woodland Terrace